The project is for construction of a dual three - lane carriageway connecting yuen long to tsing yi through the ting kau bridge 此项工程目的是- a兴建一条双程三线的分隔行车道,由元朗经汀九大桥至青衣
Limit switches gs80 are suitable for a lot of measuring tasks . 2 - and 3 - wire transmitters as well as active power supplies with 0 4 ma . 20 ma signal can be connected Gs80通用限位开它可以连接两线和三线的力传递装置,也可以连接输出0 4 ma . 20 ma信号的电源。
Both sections are scheduled for completion in 2007 . construction of the dual three - lane chok ko wan link road ( penny s bay section ) began in august 2002 for completion in august 2005 双程三线的竹篙湾连接路(竹篙湾段)已于二零零二年八月动工兴建,预计于二零零五年八月完成。
A roadworks for the remaining phase of the northwest tsing yi interchange with the lantau link ; a long span cable - supported ting kau bridge carrying a dual three - lane carriageway over rambler channel B兴建以拉索桥设计的汀九大桥,设有一条双程三线的分隔行车道架于南巴勒海峡之上
The main objective of the contract is the design , supply , installation , testing and commissioning of a single traffic control and surveillance system tcss for the operation of the new 13 . 5km long dual 3 - lane section of route 8 between sha tin and tsing yi 本工程计划之主要目的是设计供应安装及测试运作于新建全长13 . 5公里,双程三线的八号干线由沙田至青衣的交通管制及监察系统。
三线: three-way; three-wire的: 4次方是 The fourth power of 2 i ...二度三线的: two dimension three wire二度半三线的: two and a half dimension three wire线的: ligament; lineal; linear常三线: atmosphere 3rd side cut第三线: third wire三线法: three-wire method; trilinear method三线股: third liner三线圈: three-winding; triple coil三线态: triple state三线网: triple chain wire三线形: trigram三线性: trilinear三线制: three wire system; three-wire system划线的, 标线的: lineate线的,直线的: linear直线的线的: linear单相三线制: single-phase three wire system第三线干扰: tertiary interference第三线控制: third wire control第三线圈: tertiary coil; tertiary winding二度三线制: 2d-3w two dimension-three wire; two dimension-three wire二三线股: nbsp; second and third liner二相三线制: two phase three-wire system; two-phase three-wire system