温度等值线的英文
temperature contour
例句与用法
- The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam , the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam , the maximal and minimal stress distribution map in dam abutment along with the height of dam , the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations , and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam
本文研究成果可给出坝体的拱冠梁剖面和坝体中心纵剖面的温度等值线图、拱冠梁剖面和坝体上下游面应力等值线图、坝肩最大最小应力沿坝高的分布曲线、不同高程处典型点的最大最小应力值表以及不同高程处最大最小应力值表等成果,为碾压混凝土拱坝的设计和施工中采取相应的温控措施提供了参考依据。 - Because of the complexity of calculation result data , and in order to simplify the analysis of results , this paper only provides annual temperature isoline map of february , may , august and november during construction , temperature isoline map of the first , fifth , tenth , twentieth and thirtieth year during operation , duration curve of temperature and stress of typical point at different elevation , the maximal stress distribution along dam height , point at different elevation , the maximal stress distribution along dam height , and the maximal and minimal temperature and the maximal tensive stress and its position of every month
因计算结果数据量非常大,为便于成果分析,本文仅给出施工期每年2 、 5 、 8 、 11月份和运行期第1 、 5 、 10 、 20 、 30年的温度等值线图,坝体不同高程典型点温度和应力历时曲线图,最大应力沿坝高分布图,逐月最高、最低温度和最大拉应力值及相应的位置等。