Study on calculating methods of soil vertical deformation induced by pipe jacking construction 顶管施工引起的土体垂直变形计算方法研究
The application of the pipe jacking technology in the project of sewage pipe in ganzhou city 顶管施工技术在赣州市截污干管工程中的应用
Comparison analysis on electric system of pipe jacking facilities between herrenknecht amp; japanese 德国海瑞克与日式顶管设备电气系统对比分析
The reasons inducing the surface deformation and deformation mechanism during pipe jacking are studied 分析了顶管施工引起地面变形的原因和变形机理。
The application of reinforced concrete counter sprayed anchor sustain art in the upper pipe working well 钢筋混凝土喷锚逆作法支护技术在顶管工作井中的应用
Combine the sewage pipe reconstruct engineering , the locale test and measure have been made 结合杭州市污水管网改造工程,对顶管施工对环境的影响进行了现场试验和监测。
The two different method have to be devised about the air - power pipe - jacking and the bigger caliber steel pipe 气动小口径顶管和大口径钢管顶管是两种完全不同的顶管方法。
2 . the in - situ monitoring is made on the disturbance of soil induced by pipe jacking construction 对顶管施工引起的土体扰动进行了现场监测,研究了顶管工程现场测试技术。
The value of a calculated case of pipe jacking in soft soils is compared to that of observations 利用所建立的半解析单元法,就软土地层中顶管工程实例计算了施工所引起的土体位移。
In municipal construction , the pipe jacking technology has more and more riveted peoples attention because of its advantages 摘要在市政建设中,顶管技术由于其优越性,越来越受到人们的重视。