繁體版 English 日本語
登录 注册

铁路设备

"铁路设备"的翻译和解释

例句与用法

  • Railways applications - fixed installations - particular requirements for a . c . switchgear - part 1 : single - phase circuit breakers with um above 1 kv
    铁路设备.固定安装.交流开关装置的特殊要求.第1部分:电压大于1kv的单相电路断路器
  • Railway applications - fixed installations - particular requirements for a . c . switchgear - single - phase disconnectors , earthing switches and switches with um above 1 kv
    铁路设备.固定装置.交流开关专门要求.单相断路器,接地开关及与高于1kv相接的开关
  • Railways applications - fixed installations - particular requirements for a . c . switchgear - part 2 : single - phase disconnectors , earthing switches and switches with um above 1 kv
    铁路设备.固定安装.交流开关装置的特殊要求.第2部分:单相断路器接地开关及与高于1kv的开关
  • Exploring is the history of the local railway transportation , the exhibits include the historic station building , six historical coaches , a narrow gauge steam locomotive and a diesel electric engine no . 51
    博物馆主要介绍本地铁路交通的历史和发展,除保留旧火车站古迹和其他铁路设备外,还有展出窄轨蒸汽火车头51号柴油电动机车和六辆历史车卡。
  • Exploring is the history of the local railway transportation , the exhibits include the historic station building , six historical coaches , a narrow gauge steam locomotive and a diesel electric engine no . 51
    博物馆主要介绍本地铁路交通的历史和发展,除保留旧火车站古迹和其他铁路设备外,还有展出窄轨蒸汽火车头、 51号柴油电动机车和六辆历史车卡。
  • In this paper , with researching the carrying capacity under the condition of separating rail infrastructure from operation and considering the current situation of our state railway , the new calculation method of carrying capacity is presented . this method can not only exert the efficiency of railway equipments but also guarantee the quality of train running . it can offer some theory reference for calculation and application of carrying capacity after separating rail infrastructure from operation will have been done
    本文通过对“网运分离”条件下的通过能力进行系统的研究,并结合我国铁路实际情况,提出了一种新的建立在既能有效发挥铁路设备效能,又能保证铁路列车运行的一定质量为理论依据的通过能力计算方法,为“网运分离”实施到位后的通过能力计算与应用提供了一定的理论参考。
  • 更多例句:  1  2  3  4
用"铁路设备"造句  
英语→汉语 汉语→英语