抽水试验的英文
发音:
"抽水试验"怎么读用"抽水试验"造句
英文翻译手机版
- bailing experiment
- pump test
- pumping test
- pumping up water test
- pumping-out test
- pumpinging test
- trial pumping
- "抽水"英文翻译 draw water
- "试验"英文翻译 experiment; test; trial
- "抽水试验孔" 英文翻译 : water-pumping test hole
- "抽水试验,扬水试验" 英文翻译 : pump up test
- "短期抽水试验" 英文翻译 : short-term pump test
- "多孔抽水试验" 英文翻译 : multiple pumping test
- "反向抽水试验" 英文翻译 : pumping test from bottom to top; pumpingtestfrombottomtotop
- "分段抽水试验" 英文翻译 : segmented pumping test
- "连续抽水试验" 英文翻译 : continuous pumping test
- "田间抽水试验" 英文翻译 : field pumping test; fieldpumpingtest
- "野外抽水试验" 英文翻译 : field-pumping test
- "抽水试验、唧筒试验" 英文翻译 : pumping test
- "不平衡抽水试验" 英文翻译 : non-equilibrium pumping test
- "抽水试验数字分析" 英文翻译 : numerical pumping test analysis
- "定流量抽水试验" 英文翻译 : constant discharge pumping test
- "民井简易抽水试验" 英文翻译 : simple pumping test from domestic well; simplepumpingtestfromdomesticwell
- "水试验" 英文翻译 : water test
- "泵水试验" 英文翻译 : water test
- "冰水试验" 英文翻译 : ice water test
- "不排水试验" 英文翻译 : undrained test
- "敞水试验" 英文翻译 : open water experiment; open water test
- "敞水试验箱" 英文翻译 : open water test boat
- "敞水试验毂" 英文翻译 : open water test case
- "充水试验" 英文翻译 : filling water test
- "冲水试验" 英文翻译 : flushing test; hose testing
例句与用法
- Specification for pumping test
抽水试验规程 - Pumping test based 3 - d evolution inverse analysis for identification of hydrogeological parameters
基于抽水试验的水文地质参数三维进化反演 - To obtain hydraulic conductivity ( hc ) is the basis to forecast water - gushing and hc can not be determined by pumping test on a large scale for tunnels with superthick overburden
围岩渗透性是涌水预测的基础,对于超深隧道,不能通过大规模抽水试验来获得渗透性参数。 - In order to optimize control and management groundwater resource , the paper ascertains hydrologic and geological parameter on the basis of single - and multi - well unbalance flow pumping experiment , establishes the model of groundwater management system using the theory of volume balance
本文在单、群井非稳定流抽水试验的基础上,确定水文地质参数,利用水平衡原理建立地下水系统管理模型,进行优化管理和调度。 - Take middle - east district of taipusi banner as study area in the paper , combining field observation test ( pumping test and field survey ) with indoor experiment ( granule analysis and organic matter analysis etc ) , based on the relationship between hydrological parameters and physical - chemistry characteristic parameters of formation , the variability of aquifer parameters and physical - chemistry parameters of unsaturated zone have been also analyzed . the aquifer system of the taipusi banner is identified and analyzed by using the internal and outside information . on the basis of real pumping of ground water , the water resources evaluated by the water balance method
本文以太仆寺旗中东部地区为研究区域,采用野外试验(抽水试验、实地调查)和室内实验(颗分、有机质等实验)相结合的方法,推求了研究区含水层系统的水文水利参数,在系统模拟含水层水理参数与岩性物理化学特征参数之间的关系基础上,进一步分析了含水层参数及其包气带的物理、化学特征参数的空间变化特征,并利用其内外部信息对太仆寺旗含水层系统进行了辩识与分析;以现状地下水开采量为依据,采用水均衡法评价了研究区水资源总量,并利用有限单元法来模拟分析验证。 - Aiming at the present low efficiency of well irrigation works and through pumping tests and theoretical analysis , the paper derives a method for calculating the optimum water yield , the best lifting distance and economic pipe diameter of low pressure pipe delivery system of irrigated area by wells , increasing the efficiency of motor - pumped wells
针对目前井灌工程效率低下的问题,通过抽水试验,经过理论分析,推导出了井灌低压管道输水灌溉系统的最优出水量、最佳扬程和经济管径计算方法,从而可提高机井灌溉效率。 - Through summarization for complicated geohydrology and engineering geology condition of research area , the non - stability 3 - dimension flow model of ground water and land subsidence model were established in this thesis . the coupled models of ground water and land subsidence were combined with a large series of water level observation and land subsidence information to debug the parameters and ascertain the models
两者通过含水层的水位内在联系耦合在一起,并根据研究区水文地质条件及抽水试验资料,结合大量的水位观测序列资料及地面沉降观测资料对模型进行调参,标定地下热水运移的三维有限元数值模型,所建模型可以对地下水水位及地面沉降同时进行模拟预测。 - In this paper , mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping , the useful dewatering calculation model and parameters were set up . secondly , based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model , the final dewatering scheme was put forward . at last , the final dewatering scheme was appraised by observation during the construction , and it satisfied with the construction request
本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数;再根据现场抽水条件试验开发的成井技术和计算模型计算坝基和坝肩两个水文地质单元的降水井方案,并按工程类比法确定最终的降水方案;最后,通过施工过程中的观测情况对降水方案进行评价,降水方案能够很好地满足施工的要求。 - On the foundation of reference researches , through analyzing the condition of rainfall and hydrogeology of tian - tang river in the suburb of south - east of beijing , the mathematical models of the shallow ground water movement were founded . according to the experiment result of pump water and other reference data , the parameter of hydrogeology and ground water were established . on the foundation of present and future trend of using water on industry , agriculture and living , the solution of mathematical models were calculated by the method of finite element
在前人研究的基础上,本文通过对北京市东南郊天堂河流域降雨、水文地质条件的分析,建立浅层地下水运动数学模型,根据抽水试验结果并参考有关资料确定水文地质和地下水补给的有关参数,根据工业、农业、生活现状用水情况及未来的发展趋势,采用有限元的方法对地下水运动数学模型进行求解。
- 更多例句: 1 2
其他语种
- 抽水试验的日语:ようすいしけん
相关词汇
抽水试验的英文翻译,抽水试验英文怎么说,怎么用英语翻译抽水试验,抽水试验的英文意思,抽水試驗的英文,抽水试验 meaning in English,抽水試驗的英文,抽水试验怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。