If it does meet those standards, it can then use the name and advertising symbol, the logo, as it is called, for the group . 验收合格,方可使用此名称和广告标志,即所谓标识。
Aql acceptable quality level 验收合格标准
After testified to be qualified , the project can only be transferred to client to use 本工程竣工并验收合格后,才能交付发包人使用。
After testing of six months , ccdwas has been confirmed to be qualified already at present 该系统经三个月运行测试,功能正常,目前已被本钢炼钢厂验收合格。
Housing project guarantees period the computation since the day that checks and accept qualification from project complete 房屋建筑工程保修期从工程竣工验收合格之日起计算。
The free technical service period is 12 months , which will be calculated from the date that tested to be qualified 免费调试技术服务期为12个月,自本工程验收合格之日起开始计算。
Highways that have not been checked in accordance with relevant state regulations before acceptance , should not be made available for use 末按国家有关规定验收合格的公路,不得交付使用。
Upon the acceptance of the goods by a third party , party b shall pay to party a the 70 % balance within 10 days of such acceptance 该货物经过第三方验收合格后,乙方应在十日内向甲方付余款的70 % 。
The system referred above has been installed / tested / verified for acceptance ( please attach the main qualified technical specification ) 上述系统已安装/测试/通过验收(请另附上验收合格的主要技术指标) 。
After checking and up to the grade , the buyer receive the goods and affix his signature or stamp his unit seal on the seller ' s delivery order 验收合格后,需方收取货物并在供方出货单上签字或加盖单位印章。