projected background造句
例句与造句
- The main frame of the paper is that : firstly , the paper provides the background of the project . secondly , the paper mainly analyses the investment project background of the shanghai demonstrable line of the maglev train . thirdly , the paper aims at the technological possibility of the shanghai demonstrable line of the maglev train
论文的基本框架为:第一部分,提出论文立项的背景;第二部分,着重分析了上海市磁悬浮列车示范运营线项目投资的背景;第三部分,着重论述了上海市磁悬浮列车示范运营线项目投资技术可行性;第四部分,着重论述了上海市磁悬浮列车示范运营线项目投资经济可行性;第五部分,分析了光大银行参与项目贷款的可行性。 - Through searching on the technical property of such pile , taking two foundation treatments as project background which are soft foundation treatment of wuhan dongxihu segment of the jingzhu freeway in hubei province and bridge foot protection at hebi xingfu eservoir in henan province , this paper carries out test study on active mechanism of crushed stone pile filled with cement slurry and its application in dealing with high earth filled soft ground and bridge foot protection
通过对无砂混凝土小桩技术特点的探讨,以湖北京珠高速公路武汉东西湖段软基处理和河南省鹤壁市幸福水库公路桥梁基础加固为工程背景,就无砂混凝土小桩的作用机理及其处理高填方软基和桥梁基础加固等方面展开试验研究。 - The structure of this thesis is as follows : the first chapter introduces the project background ; the second chapter introduces related h . 323 protocols and rtp / rtcp protocols ; the third chapter details the components and the implementation of the bit rate adjust model ; the forth chapter gives the experiment data of the model on atm connections , and the last part the summary of this thesis by analyzing the experiment data
第二章介绍了与动态位速率调整模块相关的h . 323协议族和rtp / rtcp协议。第三章重点说明了动态位速率调整模块的组成和实现。第四章介绍了在atm线路线的实验,并通过对实验数据进行了分析,总结全文。 - This thesis takes the hunan yueyang dongting lake bridge 、 changsha hongshan bridge and changsha liuyang river bridge as the project background , supported by the national natural science foundation project “ field measurements of rain - wind - induced cable vibration on the yueyang dongting lake bridge in hunan province ” , carries out some researches as follow : 1 . this thesis introduces the development of cable - stayed bridge 、 the necessity to study the cable vibration , briefly introduces the mechanism of cable vibration and cable vibration mitigation measures
本文以湖南岳阳洞庭湖大桥、长沙洪山大桥、长沙浏阳河大桥拉索振动控制为工程背景,在国家自然科学基金项目“斜拉桥拉索风雨振现场观测与半主动控制研究”资助下,进行了以下研究工作: 1 .介绍了斜拉桥的发展,拉索振动研究的必要性并对拉索振动形态及减振措施进行了简要的论述。 - 2 . design teaching project of environmental consciousness education , point out the teaching project should complied to the five principles ; illuminate the idiographic requirement of different approach from theme , project background , teaching purpose , content and process ( site ) ; according to the idiographic condition of the author " school , designs four excellent teaching projects of environmental consciousness education in high school geographic subject neatly and individuality
2 、进行了环境意识教育教学方案的设计,指出了教学方案设计应该遵守的5个原则;并从主题、方案背景、教学目的、内容与过程(地点) 、实践结果等多个方面说明了不同途径教学方案的具体要求。根据笔者所在学校的具体条件,灵活地、个性化地设计了4个较出色的高中地理学科环境意识教学方案。 - It's difficult to find projected background in a sentence. 用projected background造句挺难的
- The article calculate the sale income , gross cost , income , cash flow , internal rate of return , net present value , payback period in etc . then i contrast analysis result of calculating with one of feasibility study and national standard , i have got a conclusion to analysis though ca7200e3 transformation - shell project from 2000 to 2005 management result can not achieve than assume , but this project management result is better than national standard . in conclusion the project is successful . 38 - 40 as proceeding the assessment , the article also gives many suggestion on the future of the project . i have a lot analysis from several aspect , they includes project background analysis , market analysis , project condition analysis , finance analysis , etc . these analysis prove that the project is feasibility
论文比较分析ca7200e3变速器整体前壳项目可研预期与项目实际运行的符合度,找出项目实际运行与可研预测之间偏差产生的原因;论文首先对项目立项决策科学性、产品技术方案可靠性、原材料供应经济性、组织机构和人力资源配置合理性进行了综合评价;然后对项目建设中费用、进度、质量、合同、信息管理工作存在问题进行了系统分析评价;接下来对项目运行状况从产量、效益多方面进行分析,找出项目运行中存在的主要问题,并分析了问题产生的主要原因;最后在项目产品未来发展需求预测基础上结合项目立项后评价、建设后评价、特别是运营状况后评价所发现的问题,对如何提高该项目管理水平给出了相关建议。 - Taking suspension bridge anchor of runyang highway bridge as project background in this paper , considering undulating angle of rock mass structural plane , angle of mean square root slope method is established by exerting fractal geometry theory . fractal dimension of profile of rock mass structural plane is calculated by above method . and roughness degree is described quantitatively , furthermore correlativity between fractal dimension and roughness coefficient ( jrc ) is analyzed
本文以润扬大桥悬索桥锚碇摩阻力研究为工程背景,运用分形几何理论,从岩体结构面起伏角的角度出发,建立了均方根坡度角法测算岩体结构面剖面轮廓线的分维数,定量描述其粗糙程度,并分析了分维数与粗糙度系数jrc之间的相关关系。 - This paper taking zigui longtanghe bridge in hubei province as a project background , studies about the unified construction technology of tower and buckle frame in erection with cableway used in steel pipe - encased concrete arch bridge constructioa based on the analysis of the construction property of long span steel pipe - encased concrete arch bridge , this paper raises the general scheme and basic structure of unified construction , analyzes the mechanical behavior of unified structure of construction statue , mainly discusses the strength , stiflhess and stability of the unified structure
本文以湖北秭归龙潭河大桥为工程背景,对大跨径钢管混凝土拱桥缆索吊装塔架扣架一体化施工技术进行了研究。论文以大跨径钢管混凝土拱桥施工特点分析为基础,提出了一体化施工的总体方案与基本结构构造,分析了施工状态一体化结构的力学行为,主要探讨了一体化结构的强度、刚度及稳定性,采用动态监控系统确保了一体化结构在桥梁施工过程中的安全可靠性,从而形成一套系统的缆索吊装施工新技术,并在实桥工程进行了应用,效果良好。 - In conclusion , the above - mentioned three applications and studies are integrated with practical engineering projects , respectively referring to slope rock mass , dam foundation rock mass and underground opening rock mass . at the same time , the computing data from laboratory experiment and spot observation has project background
上述三个方面的应用与研究都基于具体的工程问题,分别涉及了边坡岩体、坝基岩体和洞室岩体,数据来源于室内试验和现场勘测,有明确的工程实践背景。 - Combining with advanced science and technology such as modem computer network technology , database management system and modem communication technology etc , the reservoir dispatching automatization system has developed from the indispensable application system such as water inspecting system , flood forecasting system , reservoir dispatching and water information querying system etc into an integrated functioning system used for the dispatching of water power stations . using the management information system , database management system , geographic infonnation system , optimization technology , statistics etc . this paper with the project background of the three gorges cascade dispatching of reservoirs , bring forward the plan of dispatching automation system of three gorges cascade reservoirs . this project have been adopted in the three gorges project
本文应用信息管理系统、数据库管理系统,地理信息系统、最优化技术、统计学等方面的理论和知识,以满足三峡工程梯级水库调度的需要为前提,提出了三峡工程梯级水库调度自动化系统的方案结构,该方案已被三峡工程的建设所采纳,同时,在水情遥测系统的通信组网方式上,本文提出的inmarsat - c与pstn联合组网的通信方式,在我国水电站的水情测报系统中,首次在葛洲坝项目中成功地应用,并且该方式也将应用于三峡水库调度自动化系统。 - The project background of this paper is the simulation of ship campaign system , it is a special dis system . as an ripe specification of component object interact , com play an important role in windows ? desktop application . this paper apply com technique to the simulation of ship campaign system ? command console and make it as an common infrastructure of the distributed interactive system
本论文的项目背景为舰船作战系统仿真,它是一个典型的分布交互仿真系统,具有交互复杂、平台异构的特点,另外它又要求具有一定的实时性,这些都为讨论分布式对象技术的应用方法及实现问题提供了理想的背景。 - First , it emphasized project background , market of urban sewage treatment equipment , producing scale , factory address , construct condition and technique scheme . secondly , it estimated the total investment , evaluated the making - profit ability , discharging ability and finance risk according to the finance system of our country and the methods of economic evaluation , analysed the benefit of the project . finally , it drew a conclusion and brought forward some suggestion to the project owner
本项目着重对项目背景、城市污水处理设备的市场和建设规模、选址和建设条件以及项目的工程技术方案进行可行性研究,并对项目总投资进行估算,按国家现行财税制度、建设项目经济评价方法与参数,对项目的盈利能力和、清偿能力和不确定性进行了测算评价,分析了项目的经济效益,最终提出了结论和建议供业主决策。
更多例句: 上一页