×

scheduling algorithms造句

例句与造句

  1. The main purposes of scheduling algorithms are to minimize resource starvation and to ensure fairness amongst the parties utilizing the resources.
  2. A centralized scheduling algorithm assigns each data packet to a certain timeslot, frequency channel and group of base station transmitters.
  3. It is not always possible to meet the required deadline; hence further verification of the scheduling algorithm must be conducted.
  4. Most search engines use sophisticated scheduling algorithms to  decide when to revisit a particular page, to appeal to its relevance.
  5. Real-time databases can process these requests utilizing scheduling algorithms for concurrency control, prioritizing both students requests in some way.
  6. It's difficult to find scheduling algorithms in a sentence. 用scheduling algorithms造句挺难的
  7. Another common usage is as the weighting in a Weighted Shortest Job First ( WSJF ) scheduling algorithm, for improved prioritisation.
  8. The performance verification and execution of a real-time scheduling algorithm is performed by the analysis of the algorithm execution times.
  9. "' YDS "'is a scheduling algorithm for dynamic speed scaling processors which minimizes the total energy consumption.
  10. The processor sharing algorithm " emerged as an idealisation of round-robin scheduling algorithms in time-shared computer systems ."
  11. The Completely Fair Scheduler ( CFS ) uses a well-studied, classic scheduling algorithm called fair queuing originally invented for packet networks.
  12. "' Fernandez's method "'( FB ) is a method which is used in the multiprocessor scheduling algorithm.
  13. This size-duration relationship is also used in component-level scheduling algorithms with task overlaps computed to fall within total estimated project duration.
  14. Furthermore, there might be more users than data streams, requiring a scheduling algorithm to decide which users to serve at a given time instant.
  15. Both sources describe the GCRA in two equivalent ways : as a virtual scheduling algorithm and as a continuous state leaky bucket algorithm ( figure 1 ).
  16. "' Foreground-background "'is a scheduling algorithm that is used to control an execution of multiple processes on a single processor.
  17. 更多例句:  上一页    下一页

相邻词汇

  1. "schedules of controlled substances"造句
  2. "schedules of reinforcement"造句
  3. "schedules of specific commitments"造句
  4. "scheduling"造句
  5. "scheduling algorithm"造句
  6. "scheduling alliance"造句
  7. "scheduling and movement"造句
  8. "scheduling and staffing"造句
  9. "scheduling calculation"造句
  10. "scheduling calendars"造句
桌面版繁體版English日本語

Copyright © 2025 WordTech Co.