According to the application of distributed hydrology model , this paper has carried out a case study on the yellow river basin 对黄河干流17个主要流量控制站进行了连续径流模拟。
Finally , some advices are given to ensure the sustainable utilization of water resource in the two regions 在此基础上,提出了南水北调中线和汉江中下游干流供水区水资源可持续利用的对策建议。
Sanggan river is the second largest river in shanxi , which belongs to haihe water system i . e . one of the trunk streams of yongding river 桑干河是山西省的第二大河流,属海河水系?永定河的干流之一。
The model is verified by use of it in a over 700 kilometer watercourse of yangtze river , numerical results are in good agreement with measured data 在长江干流700多公里河道上洪水演进的计算结果与实测资料符合良好。
Both discharge , discharge process , sediment concentration and sediment process changed with the continuous inflow of anabranches down the river 支流的沿程汇入改变了干流的水沙条件,包括流量、流量过程、含沙量及来沙过程。
The key techniques for the lianbotan experimental warping project of the lower north main - stem of yellow river are analyzed through the model test concerned respectively 摘要通过模型试验对黄河小北干流连伯滩放淤试验工程的各关键技术分别进行了分析。
It can be used as reference for the protection of storage areas and the construction of the other cascade hydropower stations in the lancang river 从区域尺度计算漫湾水电站生态供给足迹和生态需求足迹,以为漫湾水电站库区生态环境保护和后续干流水电梯级电站建设提供参考。
The results showed that the fractal dimensions of the main stream and down stream gauging staitions were higher those that of the tributary , headwater gauging stations 结果显示,同一流域干流的日径流过程分维值要明显大于支流的分维值,下游大于上游, 4个水文站分维值年际变化趋势基本保持一致。
When dealing with the relationship between tributary and main channel during flood routing , the general method is to add the discharge of tributary to that of main channel of the same instant 在处理洪水演进过程中支流与干流洪水的相互影响时,以前的模型仅将支流流量迭加到干流同时刻的流量上。
4 . 1n order to priority meet the water needs of songhua basin and transfer more water to liao basin , in main river model " limiting line " method is used to operate reservoirs 4 、干流模型中采用了利用水库调水限制线的方法对水库进行调度,以优先满足松花江流域用水后,再尽可能向辽河流域调水。