繁體版 English
登录 注册

分项工程的英文

发音:  
"分项工程"怎么读用"分项工程"造句

英文翻译手机手机版

  • kinds of construction
  • section

例句与用法

  • The work items
    分项工程
  • The smooth implementation of the sectional works is the key to the successful construction of the anchorage foundation of the bridge
    分项工程的顺利实施是南锚碇基础成功建设的关键。
  • It is the necessary for confirming the partial and total engineering cost to examine the detailed list of engineering quantity
    摘要工程量清单审核是合理确定工程量清单中分部分项工程综合单价及工程总造价的必要程序。
  • Therefore , the multiport - butt of 3 - d truss , as well as the stability of turning over 2 - d truss were the difficulties of the lifting project
    空间立体桁架的多对口对接、平面桁架的翻身过程稳定性是该分项工程的重点和难点。
  • We will construct under the practicable state and quality requirement of client . the qualified percent of unit work up to 100 %
    严格按照国家现行的《建筑安装工程施工及验收规范》和业主的质量标准施工,单位分项工程的质量评定合格率达到100 %
  • The concealed work refers to those divisional and partial constructions which will be covered by the next procedure soon after they are completed and are unable or difficult to be re - examined
    隐蔽工程是指那些在其施工完毕后,将被下一道工序的继续施工所遮盖,而无法或难以再对它进行检查的那些分部、分项工程
  • This paper apply the gray system theories , regard unit cost of historyical similar item construction as the basis , establish the non - isometric time sequence gm ( 1 , 1 ) model of item construction unit cost
    摘要文章应用灰色系统理论,以近期同类分项工程的单方成本为依据,建立了分项工程单方成本价非等距时间序列gm ( 1 , 1 )模型。
  • The thesis introduces the theory of database design , and combined with the practical engineering , list all kind of data in unit project ^ departmental project and item project
    本文详细说明了数据库设计理论,结合本系统的实际情况,列出了质量评定过程中所涉及的各项数据,包括单位工程、分部工程及分项工程各个方面的数据。
  • This paper deals with the design and construction of the key sectional works , the round diaphragm wall and its inner lagging and bottom sealing , of the south anchorage foundation of yangluo changjiang river highway bridge
    摘要介绍阳逻长江公路大桥南锚碇基础关键分项工程圆形地下连续墙、内衬支护和封底的设计施工情况。
  • Since many detailed projects have been specified to be subcontract projects by party a , thus our company specially aims at constituting the operation measures for linking of contracted projects so as to regulate the handover , takeover and simultaneous construction of projects
    由于多项分项工程为甲方指定分包工程,所以我公司专门制定发包工程衔接点的处理措施,以规范工程的交接和同步施工。
  • 更多例句:  1  2
用"分项工程"造句  
分项工程的英文翻译,分项工程英文怎么说,怎么用英语翻译分项工程,分项工程的英文意思,分項工程的英文分项工程 meaning in English分項工程的英文分项工程怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。