繁體版 English
登录 注册

地下采煤的英文

发音:  
"地下采煤"怎么读用"地下采煤"造句

英文翻译手机手机版

  • underground coal mining

例句与用法

  • These men work underground for 6 hours a day , mining for coal
    这些人每天在地下采煤6小时。
  • Belt conveyors for underground coal mining - light construction
    地下采煤用皮带输送机.轻型构架
  • Belt conveyors for underground coalmining - idlers - part 3 : testing
    地下采煤皮带输送机.托辊.第3部分:试验
  • Belt conveyors for underground coalmining - idlers - part 2 : requirements
    地下采煤皮带输送机.托辊.第2部分:要求
  • According to status of huxi bank in xuzhou , jiangsu province , using numerical value analysis theory and technique of dam construction , this paper put forward efficiency strengthen method in the base of study and analysis
    本文结合南四湖湖西大堤地下采煤的具体情况,利用数值分析理论及堤防加固技术,在深入分析研究的基础上,提出相应有效,可行的加固措施。
  • According to status of huxi bank in xuzhoujiangsu province , using numerical value analysis theory and technique of dam construction , this paper put forward efficiency strengthen method in the base of study and analysis
    本文结合江苏省徐州市湖西大堤地下采煤的具体情况,利用数值分析理论及堤防加固技术,在深入分析研究的基础上,提出相应有效,可行的加固措施。
  • In this it has its inimitable virtue . ( 4 ) analysed the asymmetry settlement and thereout the crack because of excavating coal undergroundly oh huxi bank . , then ascertained the magnitude of settlement and the distributing of the crack
    ( 4 )对湖西大堤姚桥矿段由于地下采煤而引起的不均匀沉降以及由此产生的裂缝进行了数值分析,确定了沉降的大小以及裂缝分布的范围。
  • The main work this paper do are these like below : ( 1 ) this paper reviewed and summarized the development and actuality of bank in china , induced the variety of bank ' s disease and the measure of judge etc . ( 2 ) introduced and studied fast lagrangian analysis of continua . flac3d is a three - dimensional explicit finite - difference program . . uing this program , obtained the three - dimensional settlements of huxi bank and analyzed the tention area and the cut - off area . the result shows that there are a lot of andscape orientation cracks and portrait cracks in the bank . these cracks bring some disadvantage influence to slope stabilization and seepage of bank
    主要内容如下: ( 1 )回顾总结我国堤防发展的基本状况及运行现状,对堤防病害的种类及评判方法进行归纳。 ( 2 )对三维快速拉格郎日有限差分法进行了深入研究,并运用此理论对地下采动的结构和过程进行了数值模拟,对湖西大堤姚桥矿段由于地下采煤而引起的不均匀沉降进行了计算,得出堤体及其周围地基的三维位移场,分析了由于不均匀沉降而产生的拉应力区和剪切破坏区域。
用"地下采煤"造句  
地下采煤的英文翻译,地下采煤英文怎么说,怎么用英语翻译地下采煤,地下采煤的英文意思,地下采煤的英文地下采煤 meaning in English地下采煤的英文地下采煤怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。