繁體版 English
登录 注册

工期计算的英文

发音:  
"工期计算"怎么读用"工期计算"造句

英文翻译手机手机版

  • duration calculation

例句与用法

  • Lastly to the engineering problem such as time calculation , resource optimization and data management , optimum solution is designed , and the algorithm for generating prior sequence based on common path are originally presented
    同时分析了项目管理系统中的工期计算、资源优化、数据管理的问题,并给出基本的解决思路,同时创造性提出了基于共同顺序生成优先序列的优化算法。
  • By comparing the results of the living example , it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced . it offers a new means to calculate project time limit about indefinite item planning - management
    通过实例计算结果比较,分析了以前模糊网络关键路线算法的不合理性,证实了本文提出的新的定义下模糊关键路线法的合理性,为非确定性项目计划管理提出了新的工期计算方法。
用"工期计算"造句  
工期计算的英文翻译,工期计算英文怎么说,怎么用英语翻译工期计算,工期计算的英文意思,工期計算的英文工期计算 meaning in English工期計算的英文工期计算怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。