繁體版 English
登录 注册

应变历程的英文

发音:  
"应变历程"怎么读用"应变历程"造句

英文翻译手机手机版

  • strain history

例句与用法

  • Based on the strain history information obtained from monitoring of bridge operation state , and through detailed analysis of influential line shapes of measurement points on the bridge , a bwim ( bridge weight in motion ) method , the single - acme acutance method that can identify passing vehicle load , is established
    摘要基于桥梁运营状态监测得到的应变历程数据,通过对测点影响线形状的较深入分析,建立了识别过桥车辆荷载的一种bwim方法“单峰锐度法” 。
  • In the paper , through the calibration test of ground load , the relationship between outputs of electrical resistance of strain gauges and the external load applied on the structure has been gotten , and then the load history can directly be deduced from the measured strain history . so the fatigue load can be compiled
    本文所建立的应变法实测疲劳载荷,其主要方法是通过进行地面加载标定实验,确定所设计应变电桥输出量与结构上作用的外载荷之间的关系,再由实测应变历程直接得到载荷历程的方法。
用"应变历程"造句  
应变历程的英文翻译,应变历程英文怎么说,怎么用英语翻译应变历程,应变历程的英文意思,應變歷程的英文应变历程 meaning in English應變歷程的英文应变历程怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。