繁體版 English
登录 注册

悬吊结构的英文

发音:  
"悬吊结构"怎么读用"悬吊结构"造句

英文翻译手机手机版

  • sustained structure

例句与用法

  • Adding eccentric on front moving roller , installing the front moving roller with elastic suspention , adding the vibratory finishing plate , and installing steering device in the finisher
    重点从前行走辊加装偏心体,以弹性悬吊结构安装前行走辊,增设振动抹光平板和安装自助式转向装置方面作以介绍。
  • When the structural seismic responses of suspension - mass pendulums were analyzed with response spectrum method , the vibration modal numbers considered were to be structural first vibration modal and previous vibration modals of structural vibration as well
    用反应谱法对悬吊结构进行地震反应分析时,所考虑的振型数应为结构的第一振型和相应于结构振动的前几个振型。
  • The results indicate that the proposed method here is reliable , convenient and accurate . the method this paper presented can be used as reference for the tgp ship lifter . at the same time , it provides a successful adjustment experience for suspending structures under the load related to displacement
    本文提出的调索方案,对正在设计中的三峡升船机有一定参考价值,同时也为所受荷载与调索过程有关的悬吊结构的水平度调整提供了很好的借鉴。
  • The tower shafts , most of which are hollow and varying in cross section , and altitudinal construction bring trouble to the form work and the stress of strand wire . and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints , elastic deformation , uneven settlement and temperature changes . the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
    但大跨度桥梁混凝土索塔施工设备进场及现场管理都比较困难;塔柱多为空心变截面,且为高空作业,给模板工程及预应力张拉带来一定困难;支撑系统连接的间隙变形、弹性变形、不均匀沉降以及环境温差可导致横梁裂缝;索塔施工偏位会引起的承台和基础的附加应力,对加劲梁的架设影响大;悬吊结构未完体系(架设时)施工阶段的风致振动往往影响到施工的安全和质量;实心塔柱部分体积较大,易产生温度裂缝。
用"悬吊结构"造句  
悬吊结构的英文翻译,悬吊结构英文怎么说,怎么用英语翻译悬吊结构,悬吊结构的英文意思,懸吊結構的英文悬吊结构 meaning in English懸吊結構的英文悬吊结构怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。