沉降槽的英文
发音:
"沉降槽"怎么读用"沉降槽"造句
英文翻译手机版
- cylindrical settler
- hydroseparator
- sedimentation cell
- sedimentation tank
- settlerstorer
- settling ark
- settling tank
- settling vat
- settling vessel
- spin bath
- subsider
- thickener
- "沉降"英文翻译 subside; settle
- "槽"英文翻译 trough; manger
- "沉降槽;沉淀池" 英文翻译 : subsider
- "沉降槽池" 英文翻译 : sedimentation tank
- "初沉降槽" 英文翻译 : primary settling tank
- "单层沉降槽" 英文翻译 : one-chamber thickener; single department thickener
- "多层沉降槽" 英文翻译 : multistoried sedimentation tank
- "分离沉降槽" 英文翻译 : separating thickener
- "固体沉降槽" 英文翻译 : setting tank
- "简单沉降槽" 英文翻译 : plain sedimentation tank
- "接触沉降槽" 英文翻译 : contacting sedimentation tank
- "连续沉降槽" 英文翻译 : continuous subsider
- "平流沉降槽" 英文翻译 : horizontal sedimentation tank
- "酸沉降槽" 英文翻译 : acid settling tank
- "一次沉降槽" 英文翻译 : primary settling tank
- "预沉降槽" 英文翻译 : preliminary sedimentation tank
- "重力沉降槽" 英文翻译 : gravitation settler; gravity settler; gravity settling tank
- "锥形沉降槽" 英文翻译 : cone settling tank
- "最终沉降槽" 英文翻译 : final setting tank; final settling tank
- "哈定格沉降槽" 英文翻译 : hardinge thickner
- "圆筒形沉降槽" 英文翻译 : cylindrical sedimentation tank
- "圆柱形沉降槽" 英文翻译 : cylindrical settler
- "污水最终沉降槽" 英文翻译 : sewage final setting tank
- "自由沉降槽式分级极" 英文翻译 : free settling tank classifier
- "沈降槽" 英文翻译 : settling tank; settlingtank
例句与用法
- Development of new and high efficient sediment tanks and their applications
新型高效沉降槽的开发及其应用 - Analysis of ground traverse settlement trough caused by shield construction
盾构施工引起的地表横向沉降槽分析 - Analysis on the causes of the mudflow in the large - scale settler and countermeasures
大型沉降槽跑浑的原因分析及对策 - Compared w ith t he c alculated r esults and monitoring data , to verify i f the p resent parameters can accord with the real situation of nanjing . the distribution of surface settlement trough is obtained by one - dimensional wave theory and calculation . the range of surface settlement trough coefficient is retrofitted
通过对比peck法计算值和实测值,验证现有的经验参数是否能很好地满足南京地区的实际情况,通过对实测曲线的拟合和数值计算得到沉降槽半宽度,从而改进了南京地区横向地表沉降槽宽度系数k的取值范围,有助于盾构法在南京地区的推广和应用。 - In order to achieve the optimized tunneling approach , first , tunneling procedures , shift length , horizontal jet grouting length , bench length and space length between c and d part of crd method are optimized ; on the basis of these results , two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved . as results of the optimized scheme , the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure . the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
为得出适合本段工程的最佳施工路线,利用大型有限元通用软件ansys对开挖顺序、开挖进尺、水平旋喷长度、台阶长度及crd工法施工的c 、 d部相错长度进行了有限元数值模拟和优化分析,并利用这些分析结果,进行了两个施工方案的三维有限元动态施工模拟,得出了较优的施工方案,并利用施工后的地表沉降槽曲线,对sk3 + 355断面处隧道上方的煤气管线的安全性进行了分析,得出了利用此施工方案施工不会造成此处煤气管线破坏的结论。
其他语种
相关词汇
沉降槽的英文翻译,沉降槽英文怎么说,怎么用英语翻译沉降槽,沉降槽的英文意思,沉降槽的英文,沉降槽 meaning in English,沉降槽的英文,沉降槽怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。