灌浆帷幕的英文

发音:  
"灌浆帷幕"怎么读用"灌浆帷幕"造句

英文翻译手机手机版

  • grout curtain
  • grouted cut off wall
  • grouted cutoff wall
  • grouting screen

例句与用法

  • Complicated hydrologic and geographic conditions , and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly . three desilting tunnels are designed to meet the requirements of flood control , sediment discharge and runoff regulation . according to the performance requirements of desilting tunnels , the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining . on the basis of investigation and research , experiements and analysis , the unbonded prestressing system is used . it is the largest unbonded prestressed tunnel lining project in the world , and the first one in china
    简介黄河小浪底水利枢纽复杂的水文、地质条件以及庞大的工程规模.该枢纽设计有3条排沙洞,担负着泄洪、排沙、调节径流和保证进水口不被泥沙淤堵的任务.根据排沙洞的水库运用要求,灌浆帷幕下游排沙洞洞身段设计为混凝土后张预应力隧洞.通过大量的调研、试验、分析论证,在施工前确定该预应力方案选用无粘结预应力系统,成为目前世界上规模最大的无粘结预应力隧洞衬砌工程,在国内尚属首例
  • According to the geological conditions of baise project , erosive bands and joint fissures , f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation . 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions . by overloading the upstream water level and reducing rock strength parameter , the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined , and finally the safety factor is determined
    2 、根据百色的地形地质条件,充分模拟了蚀变带、节理裂隙、 f6断层、灌浆帷幕等,较为真实地建立了坝体与地基相互作用的整体三维数值模型;采用有限元法对坝体及坝基在不同工况下的应力应变状态开展分析,评价各工况下坝基的运行状态;而后采用超载法和综合法对大坝稳定性进行分析,模拟坝基的渐进性破坏过程,从而得到坝基在超载和强度下降过程中的破坏模式和破坏发展路径,最终确定坝基超载安全系数和综合安全系数。