The extension will sit on a number of concrete columns above ground level so that the apron area below the building can be retained for use by ground handlers and other aviation - related services 扩建工程将建立在几根高出地面的混凝土柱子上,这样,建筑物下面的地面空地可以流出来,供地勤服务人员和其他航空有关服务使用。
Built of steel and concrete at a cost of 390 million euros 520 million dollars , the bridge rests on seven pillars , one of which dubbed p2 climbs to 343 metres above ground level , making it 23 metres higher than the eiffel tower 整座桥梁由钢铁和混凝土建成,耗资3 . 9亿欧元5 . 2亿美元。桥身由七根墩柱支撑,其中有一根编号为p2的柱子高度超过地平线343米,比埃菲尔铁塔还要高23米。